TileMyRoom › Guides

How much does herringbone flooring cost to install in Melbourne?

Installation is about $68–$86 per m² for herringbone, roughly double a straight lay, and you need 15% extra boards. A 20 m² room in $65/m² boards comes to about $2,700–$3,440 supplied and installed, against $1,970–$2,520 laid straight.

Melbourne prices, GST included. Checked 25 October 2026 against the TileMyRoom calculators.

20 m² room, three patterns

Boards at $65/m² (the TileMyRoom default), installation on a flat, ready subfloor. Removal of the old floor, levelling and new skirting are extra.

PatternExtra boardsLabourSupply and install, 20 m²
Straight10%$38/m²$1,970–$2,520
Herringbone15%$75/m²$2,700–$3,440
Chevron20%$85/m²$2,930–$3,750

Herringbone vs chevron

Ways to keep the cost down

Want the number for your own room? The flooring visualiser does it in 3D, free, no sign-up.

Open the flooring visualiser

Questions people ask

How much does herringbone flooring cost to install in Melbourne?

About $68–$86 per m² for installation in 2026, plus boards and about 15% extra material for cuts.

Is herringbone more expensive than a straight lay?

Yes, roughly double the labour (about $75/m² against $38/m²) and 15% waste instead of 10%.

How much extra flooring do I need for herringbone?

Allow 15% over the floor area for herringbone and about 20% for chevron, against 10% for a straight lay.

Can you do herringbone with hybrid flooring?

Yes. Hybrid (SPC) herringbone boards are common in Australia, usually around 600 × 120 mm, click-together and waterproof.

Which costs more, herringbone or chevron?

Chevron. Labour is about $85/m² against $75/m² for herringbone, and waste is about 20% rather than 15%.

Related guides

Sources

These are guide prices for planning, not a quote. Quantities and costs depend on the room, the products you choose and what is found once work starts. Confirm waterproofing, falls and permits against the National Construction Code, Australian Standards and your council with a licensed tradesperson or building practitioner before you buy or build.